Untitled

  • rss
  • archive
  • (via alwaysinstudio)

    Source: flowerchild-michelle
    • 4 days ago
    • 196 notes
  • lohrien:

    Illustrations by PinkParasol (Annie Stegg)

    Source: lohrien
    • 5 days ago
    • 248 notes
  • lohrien:

    Papercuts by Sara Burgess

    Source: lohrien
    • 1 month ago
    • 4025 notes
  • lohrien:

    Illustrations by Luce-in-the-sky

    Source: lohrien
    • 1 month ago
    • 7656 notes
  • architecturemas:

    Savioz Fabrizzi - Maison Cambolin, Albinen 2009. 

    (via alwaysinstudio)

    Source: architecturemas
    • 2 months ago
    • 50 notes
  • (via alwaysinstudio)

    Source: designed-for-life
    • 2 months ago
    • 396 notes
  • thefluffingtonpost:

Architect Cat Fails to Deliver New Building Plans
Executives at banking giant Wells Fargo are beginning to regret hiring a cat to design their new regional headquarters in Tampa, FL. The company hired Bella, of Meowy Architectural Designs, to design their new building after the cat’s proposal won against a number of other bidders.
At first, things went well. Her first round of designs were well received and on-time. But now, she’s been missing deadlines left and right, sleeping through meetings, and generally turning in sloppy work.
“Last week she dropped off a series of blueprints that looked like they had been crumpled up into a ball and batted around the room,” said Wells Fargo SVP of Construction, Tom Juarez. “Plus, the plans included a ‘tuna vault’ that I am sure we never approved. Now she’s completely missed this week’s deadline.”
Sources indicate that Bella could be fired as early as Monday.
Via Alberto Chan.

    thefluffingtonpost:

    Architect Cat Fails to Deliver New Building Plans

    Executives at banking giant Wells Fargo are beginning to regret hiring a cat to design their new regional headquarters in Tampa, FL. The company hired Bella, of Meowy Architectural Designs, to design their new building after the cat’s proposal won against a number of other bidders.

    At first, things went well. Her first round of designs were well received and on-time. But now, she’s been missing deadlines left and right, sleeping through meetings, and generally turning in sloppy work.

    “Last week she dropped off a series of blueprints that looked like they had been crumpled up into a ball and batted around the room,” said Wells Fargo SVP of Construction, Tom Juarez. “Plus, the plans included a ‘tuna vault’ that I am sure we never approved. Now she’s completely missed this week’s deadline.”

    Sources indicate that Bella could be fired as early as Monday.

    Via Alberto Chan.

    (via alwaysinstudio)

    Source: thefluffingtonpost
    • 2 months ago
    • 271 notes
  • lohrien:

    Amelia Fletcher

    Source: lohrien
    • 2 months ago
    • 590 notes
  • maderadearquitecto:

     Leaf House designed by Laird Herbert

    (via alwaysinstudio)

    Source: really-shit
    • 3 months ago
    • 784 notes
  • mattiasinks:

Pedestrians

    mattiasinks:

    Pedestrians

    (via alwaysinstudio)

    Source: mattiasinks
    • 3 months ago
    • 574 notes
© 2012–2013 Untitled
Next page
  • Page 1 / 12